Description

Supply Gatch Material At Habshan Biglee Stock Bu Hasa Project Abu Dhabi. Completed

The process of Gatch Supplying, Laying, Watering, Grading, and Compaction Works is crucial in preparing a stable and strong base for construction projects. Gatch is supplied and laid in layers, followed by watering to achieve optimum moisture content. The surface is then graded for evenness and correct slope, and finally, compaction is performed to ensure the material is stable, dense, and able to support the weight of structures or roadways. This multi-step process ensures a solid foundation that is essential for the durability and safety of the construction.

PROJECT DETAILS

Name: Habshan – Abu Dhabi
Duration: Dec, 2022 - Oct, 2024 ( 24 Months )
Scope: Supply Gatch Material.
Main Contractor:
AL GHAYOUM CONT. & GEN. TRANSPORT EST.

Company Profile

CONTACT US

ABU Dhabi Office:

Al Sarab Commercial Complex Musaffah M-14 Block B Office No-B-18 , ABU DHABI-U.A.E.

WorkShop:

Musaffah M3 AL Firdous Property Warehouse No.251 Abu Dhabi UAE.

(+971) 50 3261462

(+971) 50 3261462

www.noblepathgt.com

Asmat@noblepath.com

Mon - Sat: 9:00 - 18:00

If you find a high quality constructor for your project?